Two Lovely Bowknot-Decaled High Borosilicate Glass Straw Cups with Bamboo Lids & Matching Bowknot Glass Straws

Two Lovely Bowknot-Decaled High Borosilicate Glass Straw Cups with Bamboo Lids & Matching Bowknot Glass Straws

Specification

Item No.: HB-PL6000128/129

Material:   High Borosilicate Glass,bamboo,silicon

Technique: hand  made

Package:   color box pack. white box pack,brown box pack

Usage:   For home, hotel, restaurant, bar

Capacity:  ≈400ml

product details

Two Lovely Bowknot-Decaled High Borosilicate Glass Straw Cups with Bamboo Lids & Matching Bowknot Glass Straws (1)

Two Lovely Bowknot-Decaled High Borosilicate Glass Straw Cups with Bamboo Lids & Matching Bowknot Glass Straws (6)
Two Lovely Bowknot-Decaled High Borosilicate Glass Straw Cups with Bamboo Lids & Matching Bowknot Glass Straws 

Specification

Item number: HB-PL6000128/129

Material:   High Borosilicate Glass,bamboo,silicon

Craft: hand  made

Packaging options: Brown box, color box,white box pack

Applications:   For home, hotel, restaurant, bar

Capacity:  ≈400ml

more popular products

······························ about our service ·····························

1. About Samples
We offer free samples for your evaluation. If samples are available, we typically provide 2-3 pieces per item at no cost. Generally, samples can be dispatched within 2 days after your request is confirmed.

2. About Design & Customization
We support custom design projects. Our professional design team can develop product designs based on your specific requirements. Opening new moulds for your samples is also an available option.

3. About Colors
For color matching, we utilize the Pantone Matching System (PMS) to ensure accuracy. You may provide the specific Pantone color codes you need. We can also advise on current popular color trends.

4. About Minimum Order Quantity (MOQ) & Lead Time

  • MOQ: Our standard Minimum Order Quantity is 5,000 pieces. However, we are flexible and can accept lower quantities for trial orders.

  • Production Lead Time: The standard production lead time is approximately 30-45 days. Expedited production, around 20 days, may be possible under certain circumstances. For items in stock, we can arrange shipment within 3 days after order confirmation.

5. About Payment Terms
Our standard payment term is by T/T (Telegraphic Transfer): 30% deposit and 70% balance payable against the copy of the Bill of Lading. We are also open to other payment methods such as Western Union or Letter of Credit at sight.

please contact us

This field is required.
This field is required.
Scroll to Top

get in touch

please let us know your requirements

Contact Information
product specifications
more message